Plummer Solar Project
Enbridge is proposing to build the Plummer Solar project to provide clean electricity to the Midcontinent Independent System Operator (MISO) grid. Electricity demand in Minnesota and throughout MISO is increasing and this project would help provide emissions-free, reliable electricity.
If constructed, the project is expected to provide 130 MW of solar energy. Plummer Solar would provide enough electricity to power roughly 27,200 Minnesota homes, once operational.
Project overview:
- Type: Solar power
- Status: Proposed
- Location: Red Lake County, MN
- Expected capacity: 130 MW
- Expected in-service date: 2027
Click on image above for larger version of map
Project Information:
Project Updates
Enbridge has submitted its Site Permit application for the Plummer Solar project to the Minnesota Public Utilities Commission (MPUC). The application includes detailed information about the project.