To power the new electric-driven compressors and ensure reliable operations, approximately 40 km of new transmission powerlines will be installed in the following locations:

  • approximately 10 km, located east of Groundbirch (CS-16).
  • approximately 29 km, located northwest of Hudson’s Hope (CS-N5).
  • approximately 1 km, located south of Taylor (CS-1B).

These overhead powerlines will largely follow existing linear infrastructure such as roads or pipeline routes to minimize environmental and public disruptions.