Minnesota aquifer work
During pipeline construction, aquifers were impacted along the Line 3 Replacement route, resulting in groundwater flows to the surface. For each of these locations, Enbridge developed a corrective action plan to stop groundwater flows. The corrective action plans required significant planning and coordination, review from multiple regulatory agencies and were implemented immediately upon approvals.
Corrective actions have been completed at all sites.
Enbridge takes protecting the environment seriously, and we are dedicated to resolving these matters quickly and thoroughly as we continue to work with the regulatory agencies on the ongoing restoration and monitoring.