‘Committed to making this right’
Chris, a construction manager with Enbridge, discusses the repair work being performed at the Clearbrook aquifer site. Working with geotechnical engineers and hydrogeologists from Barr Engineering, the mitigation plan involves lowering the groundwater pressure through a series of temporary wells, and then sealing the aquifer with grout. “We’re committed to making this right,” says Chris. As of January 2022, groundwater flow has been successfully stopped at Clearbrook.