Texas Eastern Line 31 Expansion Project

Return to project

Project scope

The Texas Eastern Line 31 Expansion Project is designed to minimize disturbances to landowners, communities, and the environment. The proposed scope includes:

  • Offset and loop approximately 11.5 miles of 36-inch diameter pipeline located in Madison County, Mississippi
  • Installation of approximately 1 mile of 16-inch lateral in Madison County, Mississippi
  • Installation of a Meter Station located in Madison County, Mississippi